SEWAGE DEPARTMENT TRAINING PROGRAM
How to Build a Free Access Gravity Sandfilter
In the alternative, a riser may be installed to elevate the lid. The riser may be no higher than 12 inches above the top of the tank. The lid must be installed no lower than 6 inches above final grade.