SEWAGE DEPARTMENT TRAINING PROGRAM

How to Build an Elevated Sandmound Sewage Disposal System

 

The piping is then covered by a minimum of 2 inches of aggregate.  The aggregate should be raked level across the entire bed.  Do not cover just the piping.

The pipes (red) are covered with 2 inches of aggregate which is leveled over the bed.

 

Mounding aggregate over the piping is not acceptable.

 

Back       Next

 

Back to Program Index

Back to Home Page